News
Home > News > Content
How Long Does It Take To Build The Indoor Trampoline Park/indoor Playground Equipment?
- Aug 07, 2018 -

  Generally speaking ,it Usually need 1-2 months. 

The delivery time is 20 days when trampoline under 200 square meters20-30 days needed when the size 200-1000Sqm.We need double confirm once the size upon 1000 Sqm 

trampoline installation.jpg

Production time will be based on the production plan for the current month. Please confirm with us before the order.In addition to production, you also need to consider the time required for transportation, installation and installation.

installtion of trampoline.jpg